Plant compliance, from the gate to the end of the asset's life.
Raion Ready digitises the Introduction to Site process and keeps one live record of every machine on site — using your site's own requirements, approvers and approval order.
| Equipment | Brake test | Fire suppression |
|---|---|---|
| Haul truck 31 | Valid | Valid |
| Excavator 07 | Expiring Soon | Valid |
| Water cart 02 | Pending Approval | Valid |
| Light vehicle 114 | Valid | N/A |
| Dozer 12 | Expired | Not Started |
See Raion Ready in two minutes
How a machine gets from the gate to a compliant record on site — and stays that way.
Every machine on site carries a trail of approval requirements, plant safety files, records and expiry dates. Someone has to manage all of it.
Inspections, certificates, registrations and sign-offs have to be in place before plant goes to work, and kept current for as long as it stays. Run through paper packs, inboxes and spreadsheets, that creates four problems.
Approval chains are complex
Each plant type has its own requirements and its own approvers. Mechanical, electrical, planning and owner sign-offs are typically all required, often in sequence, and the whole approval chain can stall when any one person is unavailable or the paperwork is misplaced.
Approvals that run themselves
You set who completes each requirement, who approves it, and in what order. The work routes itself electronically, in parallel where it can and in sequence where it must. If an approver is away, a stand-in can easily be nominated.
Nobody can see where things are up to
Is the approval with the inspector, an engineer or nobody? Which certificates expire next month? The answer is often in someone's inbox, a pigeonhole, a shared drive, or a spreadsheet only one person maintains.
Live status for every machine
Every requirement on every machine shows a live status, including its current compliance status, who any approvals are currently with. Where each approval is up to is always live.
The admin load is enormous
Paper packs to chase, sign, scan and file. Registers to keep in step with the documents behind them. It's time spent on administration that adds nothing to the safety of the machine.
Less paper to push
Requests, evidence and approvals move through one system instead of between inboxes. Contractors and inspectors upload directly against the right requirement, and once evidence is approved it's locked and filed.
Compliance never finishes
Every inspection, certificate and registration expires on its own schedule. Each renewal restarts the paperwork, and missing one is easy.
Expiry calculated, not remembered
Expiry dates are worked out from the record date and your validity periods, with a warning before anything lapses. One expired certificate is renewed on its own, without re-introducing the machine.
When this lives in spreadsheets, shared drives and people's heads, the answer takes a day. It should take a screen.
See how it fits togetherOne source of truth
Every piece of plant. Every record. Every expiry date. All workflow history.
- Expiry dates
- Record details
- Workflow status & history
- Site record configuration
Whoever owns or introduces the plant, is responsible for keeping its records current.
Different sites, different rules, same product
The site's configuration lives in the record too: which workflow applies, which roles must approve, and how long a record stays valid. Two sites can run genuinely different approval paths without changing how vendors, requestors or inspectors work.
Four roles. Four views of the same record.
Pick a role to see what that person does and what they see. The full product is best seen in a walkthrough.
One system from the gate to the end of the asset's life
Configure
The site sets what applies to each plant type, who completes it, who approves it, and in what order.
Introduce
Equipment is requested, approved at the site's gateway, and registered.
Comply
Each requirement is routed to its completer, evidence is uploaded, and approvals are given in sequence.
Maintain
Live status, expiry warnings, and single-record renewals — no re-introduction.
Flexible to set up. Regimented once it's running.
Configured, not hardcoded
Plant types, requirements, validity periods, approval chains and sequencing are all set by your administrators. Two sites in the same company can run different regimes.
The site owns its record
Contractors keep their own fleet data, and it follows the machine between sites. The compliance record — evidence, approvals, status — belongs to the site, and a vendor can't alter it.
Approved means closed
Once evidence is approved it's locked. It can't be edited or deleted through the workflow, and superseded revisions stay in the history.
Your requirements. Your approvers. Your order.
The workflow sequencer holds your whole regime on one screen. Requirements with the same number run together; a higher number waits until the step before it is approved.
| Requirement | Haul truck | Excavator | Light vehicle |
|---|---|---|---|
| Brake test | 1 | 1 | 1 |
| Fire suppression | 2 | 2 | N/A |
| Isolation points | 2 | 2 | 1 |
| Engineering sign-off | 3 | 3 | 2 |
Every requirement, every machine, one live status
Expiry is calculated, not remembered: record date plus validity period. A warning window — 30 days by default — turns it amber before it lapses.
Approved and in date.
Inside the warning window.
Past its expiry date.
A workflow is running.
No record yet.
Equipment is compliant when every applicable requirement is current — and you can see the exceptions without going looking for them.
Book a demo
See how Raion Ready takes a machine from the gate to its first renewal.
